HomeProjects
| LIST OF PROJECTS | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Project No. | Project Name | Type OF Project | Client | Scope | Year | ||||
| 1060 | Design Services-Fuel Storage and Distribution Stations | Design | Oman Oil co. (Omco) | FEED | 2021 | ||||
| 1062 | INDUSTRIAL LOGISTICS PROPERTIES ASSESMENTS – TECHNCIAL DUE DILIGINCE SURVEYS | Due Diligence | CUNDAL Co. | Surveys | 2021 | ||||
| 1064 | FIRE PROTECTION CONSULTANCY - MARAFIQ | Design | Marafiq - RMI | HCIS | 2021 | ||||
| 1065 | WEIR ARABIAN METAL SPARK FACILITY | Design | WEIR | Design | 2021 | ||||
| 1066 | REVIEW & PROFESSIONAL CERTIFICATION OF FIRE PROTECTION & DETECTION SYSTEMS SAUDI ARAMCO | HCIS | ARAMCO | HCIS | 2021 | ||||
| 1068 | UPGRADE FIRE PROTECTION SYSTEM IN NORTH PARK 1, 2 & 3 DHAHRAN, SAUDI ARAMCO | Design | ARAMCO | Design | 2021 | ||||
| 1069 | KAFD OUTDOOR CINEMA - CIVIL DEFENCE CONSULTANT REPORT | Due Diligence | KAFD | Design | 2021 | ||||
| 1070 | AKIRA BACK & AB STEAK RESTAURANT- AOR SERVICE | Design | AKIRA | Engineering | 2022 | ||||
| 1072 | KAFD ROSHAN | Design | KAFD | Design | 2022 | ||||
| 1075 | RIYADH DATA CENTRE | Engineering Services | JLL | Design | 2022 | ||||
| 1076 | REVIEW & CERTIFICATION OF FIRE ALARM & DETECTION SYSTEMS | Design | REDA | HCIS | 2022 | ||||
| 1078 | REVIEW ALARM SYSTEMS DESIGN OBSOLETE FIRE ALARM SYSTEM, DH, ARAMCO | Due Diligence | ARAMCO | HCIS | 2022 | ||||
| 1079 | MA - SITE ENGINEER SERVICES - MECH & IE | PMC | MAADEN | PMC | 2022 | ||||
| 1080 | MA - LAB HVAC SYSTEM EVALUATION | Design | MAADEN | Design | 2022 | ||||
| 1082 | PRE-CONCEPT LOCAL CODE COMPLIANCE REVIEW SERVICES – DGDA, KSA | Due Diligence | DGDA | PMC | 2022 | ||||
| 1084 | BIC-ELECTRICAL STUDY & RISK ASSESSMENT FOR GAS | INDUSTRIAL | BIC | Design | 2023 | ||||
| 1137 | Detailed Engineering for Installation of Ultrasonic Flare Flow Metere | O & G | FTA-SABIC | Engineering | 2023 | ||||
| 1140 | Nitrogen Compressor Replacement Project at Yanpet | O & G | SABIC | Design | 2023 | ||||
| 1141 | FTA-YNP-Replacement of LIBRA Scale for Line 4 & 5 | O & G | SABIC | Design | 2023 | ||||
| 1142 | ARAMCO Swichgear Replacement | O&G | ARAMCO | Design | 2023 | ||||
| 1143 | TSF Pond, Pumps and Pipeline Project | O&G | MAADEN | Design | 2023 | ||||
| 1144 | TASNEE-Ethylene Cracker Mega Project | HCIS | TASNEE | HCIS | 2023 | ||||
| 1145 | ARAMCO-Compressor Relocation Project | O&G | WESCOSA-ARAMCO | Design | 2023 | ||||
| 1146 | Warehouse Capcity Assessment | Mines & Minerals | MAADEN | Consultancy | 2023 | ||||
| 1147 | Spare Clarifier Project | O&G | MAADEN | Feasibiltiy & FEED | 2024 | ||||
| 1148 | Rabigh 3 Independent Water Project - SAF Consultant Service | HCIS | EPC | HCIS | 2024 | ||||
| 1151 | Saudi Aramco Home Ownership | Residential | Saudi Aramco | PMC | Evaluation | ||||
| 1162 | General Engineering Services-MPC | Engineering Services | Maaden-Phosphate | Engineering | Ongoing | ||||
| 1164 | Fire Protection Consultancy - Marafiq | HCIS | Marafiq - RMI | HCIS APPROVAL | 2024 | ||||
| 1169 | IBNSINA-Installation of Dry-Chemical Suppression System POM Plant (SP-191600002) | HCIS | IBNSINA | HCIS APPROVAL | 2024 | ||||
| 1170 | SABIC-IBN ZAHR UBS Barcode Machines Replacement | Petrochemical | SABIC/IBNZAHR | Design | 2024 | ||||
| 1172 | TASNEE-Ethylene Cracker Mega Project Studies FRA & 3D Mapping | Petrochemical | TASNEE | Safety | 2024 | ||||
| 1174 | ARAMCO-Compressor Relocation Project | O&G | WESCOSA-ARAMCO | Design | 2024 | ||||
| 1176 | Warehouse Capcity Assessment | Mines & Minerals | MAADEN | Consult | 2024 | ||||
| 1178 | Spare Clarifier Project | O&G | MAADEN | Feasibiltiy & FEED | 2024 | ||||
| 1180 | Rabigh 3 Independent Water Project - SAF Consultant Service | Petrochemical | EPC | Safety | Evaluation | ||||
| 1182 | Saudi Aramco Home Ownership, Inc. 2 - PM | Residential | Saudi Aramco | PMC | Evaluation | ||||
| 1184 | SABIC-Ar Razi Cyber Security Project | Petrochemical | SABIC/FTA | Design | 2024 | ||||
| 1186 | Fire Protection Consultancy - Marafiq | O&G | Marafiq - RMI | HCIS | 2024 | ||||
| 1188 | Risk Assessment | Petrochemical | TASNEE/SGC | Safety | 2024 | ||||
| 1190 | GISCO - Design Review & Approval | Industrial | GISCO | PMC | 2024 | ||||
| 1192 | SWCC Al Khobar -2- ACCIONA | O&G | SWCC-RMI | Safety | 2024 | ||||
| 1194 | MA'ADEN - DESIGN & ENGINEERING OF SUB-STATION CABLES | O & G | MAADEN | O & G | 2024 | ||||
| 1196 | MA'ADEN - ETAP Study & Improve Monitoring of the SS | O & G | MAADEN | O & G | 2024 | ||||
| 1198 | GISCO - Design Review & Approval | Industrial | GISCO | DESIGN REVIEW | 2024 | ||||
| 1200 | SWCC Al Khobar -2- ACCIONA | HCIS | SWCC-RMI | HCIS | 2024 | ||||
| 1206 | SABIC - Integrate the 3100-3111 Belt Weightometers to the PLC | O & G | SABIC-Hadeed | Design | 2024 | ||||
| 1208 | MAADEN-Washer Bypass Line | Mines & Minerals | MAADEN | Engineering | 2024 | ||||
| 1214 | Stress Analysis for Fire water pump-REDA SABIC-Ibn Zahr | Industrial | SABIC-SAFCO | Engineering | 2024 | ||||
| 1215 | MAADEN-Hotwell Sump and Piping Design | Mines & Minerals | MAADEN | Engineering | 2025 | ||||
| 1216 | Royal Commission Fire Stations Safety | Industrial | RC-EGEC | HCIS | 2025 | ||||
| 1217 | MAADEN-TSF Pond Pumps and Pipeline Design | Mines & Minerals | MAADEN | Engineering | 2025 | ||||
| 1218 | Zamil Offshore Fire system Design | Offshore | Zamil Shipyard | HCIS | 2025 | ||||
| 1219 | TASNEE- Integration of Fire Alaram System | Petrochemical | TASNEE | FEED | 2025 | ||||
| 1220 | TASNEE- Fire Pump Controller Upgrade Project | Petrochemical | TASNEE | HCIS | 2025 | ||||
| 1221 | MAADEN-8" Bypass Line Design and Stress Analysis | Mines & Minerals | MAADEN | Engineering | 2025 | ||||
| 1222 | TASNEE-PA System Upgrade | Petrochemical | TASNEE | FEED | 2025 | ||||
| 1223 | ORT-Phosphate Mega Project | Mines & Minerals | MAADEN | ORT | 2025 | ||||
| 1225 | ARAMCO-PRP Fire System Upgrade KJO | O&G | ARAMCO-KJO | FEED | 2025 | ||||
| 1226 | 176-C13/ P&C OF SHARED SERVICES FACILITIES - (HCIS) SAF | INDUSTRIAL | RC-EGEC | HCIS | 2025 | ||||
| LIST OF PROJECTS | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Project No. | Project Name | Type OF Project | Client | Scope | Year | ||||
| 1060 | Design Services-Fuel Storage and Distribution Stations | Design | Oman Oil co. (Omco) | FEED | 2021 | ||||
| 1062 | INDUSTRIAL LOGISTICS PROPERTIES ASSESMENTS – TECHNCIAL DUE DILIGINCE SURVEYS | Due Diligence | CUNDAL Co. | Surveys | 2021 | ||||
| 1064 | FIRE PROTECTION CONSULTANCY - MARAFIQ | Design | Marafiq - RMI | HCIS | 2021 | ||||
| 1065 | WEIR ARABIAN METAL SPARK FACILITY | Design | WEIR | Design | 2021 | ||||
| 1066 | REVIEW & PROFESSIONAL CERTIFICATION OF FIRE PROTECTION & DETECTION SYSTEMS SAUDI ARAMCO | HCIS | ARAMCO | HCIS | 2021 | ||||
| 1068 | UPGRADE FIRE PROTECTION SYSTEM IN NORTH PARK 1, 2 & 3 DHAHRAN, SAUDI ARAMCO | Design | ARAMCO | Design | 2021 | ||||
| 1069 | KAFD OUTDOOR CINEMA - CIVIL DEFENCE CONSULTANT REPORT | Due Diligence | KAFD | Design | 2021 | ||||
| 1070 | AKIRA BACK & AB STEAK RESTAURANT- AOR SERVICE | Design | AKIRA | Engineering | 2022 | ||||
| 1072 | KAFD ROSHAN | Design | KAFD | Design | 2022 | ||||
| 1075 | RIYADH DATA CENTRE | Engineering Services | JLL | Design | 2022 | ||||
| 1076 | REVIEW & CERTIFICATION OF FIRE ALARM & DETECTION SYSTEMS | Design | REDA | HCIS | 2022 | ||||
| 1078 | REVIEW ALARM SYSTEMS DESIGN OBSOLETE FIRE ALARM SYSTEM, DH, ARAMCO | Due Diligence | ARAMCO | HCIS | 2022 | ||||
| 1079 | MA - SITE ENGINEER SERVICES - MECH & IE | PMC | MAADEN | PMC | 2022 | ||||
| 1080 | MA - LAB HVAC SYSTEM EVALUATION | Design | MAADEN | Design | 2022 | ||||
| 1082 | PRE-CONCEPT LOCAL CODE COMPLIANCE REVIEW SERVICES – DGDA, KSA | Due Diligence | DGDA | PMC | 2022 | ||||
| 1084 | BIC-ELECTRICAL STUDY & RISK ASSESSMENT FOR GAS | INDUSTRIAL | BIC | Design | 2023 | ||||
| 1137 | Detailed Engineering for Installation of Ultrasonic Flare Flow Metere | O & G | FTA-SABIC | Engineering | 2023 | ||||
| 1140 | Nitrogen Compressor Replacement Project at Yanpet | O & G | SABIC | Design | 2023 | ||||
| 1141 | FTA-YNP-Replacement of LIBRA Scale for Line 4 & 5 | O & G | SABIC | Design | 2023 | ||||
| 1142 | ARAMCO Swichgear Replacement | O&G | ARAMCO | Design | 2023 | ||||
| 1143 | TSF Pond, Pumps and Pipeline Project | O&G | MAADEN | Design | 2023 | ||||
| 1144 | TASNEE-Ethylene Cracker Mega Project | HCIS | TASNEE | HCIS | 2023 | ||||
| 1145 | ARAMCO-Compressor Relocation Project | O&G | WESCOSA-ARAMCO | Design | 2023 | ||||
| 1146 | Warehouse Capcity Assessment | Mines & Minerals | MAADEN | Consultancy | 2023 | ||||
| 1147 | Spare Clarifier Project | O&G | MAADEN | Feasibiltiy & FEED | 2024 | ||||
| 1148 | Rabigh 3 Independent Water Project - SAF Consultant Service | HCIS | EPC | HCIS | 2024 | ||||
| 1151 | Saudi Aramco Home Ownership | Residential | Saudi Aramco | PMC | Evaluation | ||||
| 1162 | General Engineering Services-MPC | Engineering Services | Maaden-Phosphate | Engineering | Ongoing | ||||
| 1164 | Fire Protection Consultancy - Marafiq | HCIS | Marafiq - RMI | HCIS APPROVAL | 2024 | ||||
| 1169 | IBNSINA-Installation of Dry-Chemical Suppression System POM Plant (SP-191600002) | HCIS | IBNSINA | HCIS APPROVAL | 2024 | ||||
| 1170 | SABIC-IBN ZAHR UBS Barcode Machines Replacement | Petrochemical | SABIC/IBNZAHR | Design | 2024 | ||||
| 1172 | TASNEE-Ethylene Cracker Mega Project Studies FRA & 3D Mapping | Petrochemical | TASNEE | Safety | 2024 | ||||
| 1174 | ARAMCO-Compressor Relocation Project | O&G | WESCOSA-ARAMCO | Design | 2024 | ||||
| 1176 | Warehouse Capcity Assessment | Mines & Minerals | MAADEN | Consult | 2024 | ||||
| 1178 | Spare Clarifier Project | O&G | MAADEN | Feasibiltiy & FEED | 2024 | ||||
| 1180 | Rabigh 3 Independent Water Project - SAF Consultant Service | Petrochemical | EPC | Safety | Evaluation | ||||
| 1182 | Saudi Aramco Home Ownership, Inc. 2 - PM | Residential | Saudi Aramco | PMC | Evaluation | ||||
| 1184 | SABIC-Ar Razi Cyber Security Project | Petrochemical | SABIC/FTA | Design | 2024 | ||||
| 1186 | Fire Protection Consultancy - Marafiq | O&G | Marafiq - RMI | HCIS | 2024 | ||||
| 1188 | Risk Assessment | Petrochemical | TASNEE/SGC | Safety | 2024 | ||||
| 1190 | GISCO - Design Review & Approval | Industrial | GISCO | PMC | 2024 | ||||
| 1192 | SWCC Al Khobar -2- ACCIONA | O&G | SWCC-RMI | Safety | 2024 | ||||
| 1194 | MA'ADEN - DESIGN & ENGINEERING OF SUB-STATION CABLES | O & G | MAADEN | O & G | 2024 | ||||
| 1196 | MA'ADEN - ETAP Study & Improve Monitoring of the SS | O & G | MAADEN | O & G | 2024 | ||||
| 1198 | GISCO - Design Review & Approval | Industrial | GISCO | DESIGN REVIEW | 2024 | ||||
| 1200 | SWCC Al Khobar -2- ACCIONA | HCIS | SWCC-RMI | HCIS | 2024 | ||||
| 1206 | SABIC - Integrate the 3100-3111 Belt Weightometers to the PLC | O & G | SABIC-Hadeed | Design | 2024 | ||||
| 1208 | MAADEN-Washer Bypass Line | Mines & Minerals | MAADEN | Engineering | 2024 | ||||
| 1214 | Stress Analysis for Fire water pump-REDA SABIC-Ibn Zahr | Industrial | SABIC-SAFCO | Engineering | 2024 | ||||
| 1215 | MAADEN-Hotwell Sump and Piping Design | Mines & Minerals | MAADEN | Engineering | 2025 | ||||
| 1216 | Royal Commission Fire Stations Safety | Industrial | RC-EGEC | HCIS | 2025 | ||||
| 1217 | MAADEN-TSF Pond Pumps and Pipeline Design | Mines & Minerals | MAADEN | Engineering | 2025 | ||||
| 1218 | Zamil Offshore Fire system Design | Offshore | Zamil Shipyard | HCIS | 2025 | ||||
| 1219 | TASNEE- Integration of Fire Alaram System | Petrochemical | TASNEE | FEED | 2025 | ||||
| 1220 | TASNEE- Fire Pump Controller Upgrade Project | Petrochemical | TASNEE | HCIS | 2025 | ||||
| 1221 | MAADEN-8" Bypass Line Design and Stress Analysis | Mines & Minerals | MAADEN | Engineering | 2025 | ||||
| 1222 | TASNEE-PA System Upgrade | Petrochemical | TASNEE | FEED | 2025 | ||||
| 1223 | ORT-Phosphate Mega Project | Mines & Minerals | MAADEN | ORT | 2025 | ||||
| 1225 | ARAMCO-PRP Fire System Upgrade KJO | O&G | ARAMCO-KJO | FEED | 2025 | ||||
| 1226 | 176-C13/ P&C OF SHARED SERVICES FACILITIES - (HCIS) SAF | INDUSTRIAL | RC-EGEC | HCIS | 2025 | ||||